PI-135 Professional Basic ATD – 28972 Bruce Hampton

Project Description

Pi-135 Basic ATD Professional system

  • 5 Screen Enhanced Visual System
  • Pro Panel 3 with MEL, SEL, and King Air throttle quadrants
  • Single and Multi engine switch set
  • AP 4000 Avionics
  • AP 4000 E500 module
  • Rudder Pedals
  • Touchscreen instrument monitor
  • iPad instructor station
  • GTN 650/750 software add-on
  • Headset adapter

Project Progress

100%

Project Timing

  • Start
    Dec 16 2021
  • End
    Feb 16 2022

12/16/2021 02/16/2022

100%

Overall Project Completion

  • Assembly is halfway finished!

    The simulator components are 50% assembled on the pilot deck

    20%
  • Software setup is finished and testing stage has started!

    The simulator is now going through testing procedure

    60%

100%

  • 40%

    Assembly is finished and software installation has begun!

    The simulator hardware is fully assembled and software setup has started

  • 80%

    Simulator testing has finished and boxing stage has begun!

    The simulator is fully ready to go, and will soon be boxed up

20%

Assembly is halfway finished!

The simulator components are 50% assembled on the pilot deck

40%

Assembly is finished and software installation has begun!

The simulator hardware is fully assembled and software setup has started

60%

Software setup is finished and testing stage has started!

The simulator is now going through testing procedure

80%

Simulator testing has finished and boxing stage has begun!

The simulator is fully ready to go, and will soon be boxed up

Hardware - first stage 100% Complete 2/2 Tasks completed

100%

2/2 Completed Tasks

  • Pilot deck preparations
  • Metalwork assembly

Hardware - second stage 100% Complete 2/2 Tasks completed

100%

2/2 Completed Tasks

  • Computer setup and cable management
  • Avionics and miscellaneous

Software 100% Complete 1/1 Tasks completed

100%

1/1 Completed Tasks

  • Software installation

Testing 100% Complete 1/1 Tasks completed

100%

1/1 Completed Tasks

  • Testing all system of the simulator

Shipping 100% Complete 4/4 Tasks completed

100%

4/4 Completed Tasks

  • Disassembling the system for shipment
  • Putting on palette and wrapping
  • Boxing up the simulator
  • Palette received by the carrier